Skip to main content Skip to footer site map
  • DONATE

Impossible Builds | Clip | Arrival of the Crane

Project Manager Pat Feehan and his team must work around the clock to assemble the newly arrived crane before the hectic Thanksgiving holiday. However, with only 24 hours remaining and limited street space available, the crane must be constructed from the ground up — a process that requires the most meticulous of calculations.

S1 E4 | 0:02:59 | AIRED: 10/6/2021 |
THIRTEEN Passport | A benefit of membership | Activate Now
Membership Promo

NEWSLETTER SIGNUP

CONNECT WITH THIRTEEN